Poole Dental Center
Client - Greendale
Value - £104,600.00
Duration - 2 weeks
Profile Number - 22/37
Suttle Projects and Suttle Piling collaborated on this job in Poole. Suttle Projects were instructed to break out and remove the tarmac footpath as well as breaking out and removing the kerbs along the southern boundary. We also drilled 2 trial holes to locate the building footing and a further 2 holes to confirm the drainage location. We excavated material which was removed via muck away, type 1 was then used to install a 600mm thickness pile mat before CFA piling.
Good value, high quality materials and service