Case Studies

Gabion Stone to Poole Railway

Customer – Network Rail

Material – Gabion stone

Overview:

In June 2017, Suttle Stone Quarries supplied around 400 tonnes of gabion stone to reinforce a railway embankment at Holes Bay, Poole.

The project, which was carried out by Network Rail, set out to repair and fill voids in an isolated coastal location, classed as a SSSI and Ramsar site.

Featured image: (c) Tony Gwynne