• Spyway Orchard

    Good value, high quality materials and service

Spyway Orchard

Spyway Orchard

Client - Markline Construction
Duration - Ongoing

Download Full Case Study (PDF)

Suttle Stone Quarries supplied:

  • 3,800t of 6F5 Limestone
  • 1,500t Type 1 Dorset Limestone
  • 225t 6G Dorset Gabion
  • 16,000t Inert Muckaway

Spyway Orchard is being built by housing association Aster Group along with developer Drew Smith Ltd. It will provide two, three and four-bedroom houses, as well as one-bedroom flats.The majority ofthe homes on the scheme will only be available for local residents or those with a strong connection to the area.The development is close to the National Trust Spyway car park that leads down to the coast and Dancing Ledge.

Alongside large quantities of Sub-Base materials Suttles supplied 225t of 6G Dorset Gabion Limestone which has been placed in gabion baskets to form a sleek retaining wall when entering the new estate.