Panorama Road Jetty
The project was to build a jetty at Sandbanks in Poole serving a luxury property on the waterfront. Suttle Piling were contracted to install the timber piles required to support the jetty.
It was necessary to transport our 25-tonne excavator-based rig on a flat-top deck cargo barge, which was in turn pushed to the site location by a workboat. Arriving at the jetty site, our Movax unit was attached to the excavator and the timber piles were pitched and driven until they were self-supporting. Once position was checked with shore based digital instruments, each pile was progressively driven to design level.
All of the hydraulic systems on our rigs are filled with EA approved Fuchs bio-degradable oil offering an extra level of environmental protection when working around water courses.
Good value, high quality materials and service